Home Blogs About Us Contact Us
📞 0777 554 225 Get In Touch
🔧 ERP Module

Engineering
(Bill of Quantity)

Every job costed against its BOQ, from the first bag of cement to the final sign-off.

AccSoft ERP's Engineering module links a construction or engineering job to its bill of quantity, controls the materials and services issued to site, and closes the job with actual cost against the BOQ. Every document is approved before it moves on, so nothing leaves the store or hits the job without sign-off.

AccSoft ERP Engineering and Bill of Quantity module dashboard BOQ job workflow Sri Lanka

The Job Workflow

Seven documents, one chain, with an approval step between each. The dashboard shows the flow exactly as your site and office teams work it.

📄
1
Job
Open a job for a customer, project, stage and location with start, complete and due dates.
🔢
2
BOQ
List raw materials and quantities per project, stage and batch. One job can carry several BOQs.
🚚
3
Issue Note
Issue materials from a location to the job against the approved BOQ. Stock is drawn down immediately.
↩
4
Issue Return
Return unused material to stock, approved before it reduces job cost.
⚙️
5
Service Consumption
Record labour, machine time and sub-contracted services consumed by the job.
↩
6
Service Return
Reverse services recorded in error or not performed, approved before posting reversal.
✅
7
Complete BOQ
Approve completion, compare actual vs BOQ, and close the job with Complete and Add to Stock.
AccSoft ERP Engineering workflow dashboard: job, BOQ, issue note, issue return, service consumption, service return, complete BOQ with approvals
Module dashboard: the job workflow with an approval step between each document

Approval Control on Every Document

Engineering jobs run for months and consume high-value materials. AccSoft ERP puts an approval level on every document in the chain, not just the job. User permissions decide who can approve at each stage.

📄
Job
Approved before any BOQ can be raised against it.
✓ Approval Required
🔢
Bill of Quantity
Approved before materials or services can be issued.
✓ Approval Required
🚚
Issue Note
Approved before stock and cost move to the job.
✓ Approval Required
⚙️
Service Consumption
Approved before service cost is posted to the job.
✓ Approval Required
↩
Issue Return
Approved before reversing a stock and cost posting.
✓ Approval Required
↩
Service Return
Approved before reversing a service cost posting.
✓ Approval Required
✅
Complete BOQ
Approved before the job is closed and cost finalised.
✓ Approval Required

See It in Action

Every screen is designed for Sri Lankan engineering and construction businesses, with VAT, SSCL and local approval workflows built in from the start.

AccSoft ERP Bill of Quantity screen with raw materials grid BOQ software Sri Lanka
Bill of Quantity with item, description and quantity per line
AccSoft ERP Issue Note screen for materials issued against an approved BOQ engineering ERP Sri Lanka
Issue Note against an approved BOQ

Why AccSoft ERP for Engineering?

Everything your project team needs is connected, not bolted on.

🔗
Fully Integrated
Material issues draw down Inventory, purchase costs flow in from Purchases & Payables, customer billing goes through Sales & Debtors, and every posting lands in the General Ledger in Banking & Journal, with no double entry.
📈
True Job Cost
Material, service and variance are captured per job, so you know what each job actually cost against its BOQ, not just what it should have cost.
🔒
Controlled Sites
Approval levels on every document mean no material leaves the store and no job closes unchecked. Every document shows its Approved / Close status at a glance.
🇳🇰
Built for Sri Lanka
VAT, SSCL and local document formats are standard, not add-ons. Create and view customer invoices directly from a BOQ with VAT and SSCL applied per line. See our local tax compliance guide.
📋
Reusable BOQs
Define standard bills of quantity once in the Item Assembly master and pull them into any job with Select BOQ, saving time on repeat projects.
🌟
Proven Since 1998
AccSoft Solutions has supported Sri Lankan businesses for over 25 years, with more than 5,000 active installations across construction, engineering, manufacturing and services.

Who Uses This Module?

Designed for Sri Lankan engineering and construction businesses who need actual cost against the BOQ for every job.

Building and civil contractors costing sites against BOQs
MEP (mechanical, electrical and plumbing) contractors managing material issues per project
Interior fit-out and joinery contractors working to client bills of quantity
Road, drainage and infrastructure contractors with multi-stage jobs
Fabrication and installation firms combining material and site labour costs
Any engineering business that needs actual cost against the BOQ for every job

Frequently Asked Questions

Common questions about the Engineering (BOQ) module.

Which engineering documents require approval?
All of them. Jobs, BOQs, issue notes, issue returns, service consumption, service returns and BOQ completion each carry an approval level, and user permissions control who can approve at each stage. Every document shows its Approved / Close status at a glance.
Can one job have more than one BOQ?
Yes. A job can carry several BOQs and batches, each with its own materials, stage and completion status, useful for multi-stage construction projects.
How is job cost calculated?
Actual material issued, less returns, plus actual services consumed, less returns, are accumulated on the job. On completion the variance against the BOQ is reported, giving you a clear picture of over or under-spend per job.
Does the system support partial completion?
Yes. A BOQ can be completed in parts, and the partial variance and progress reports track what is done and what remains across all stages of the project.
Can we bill the customer from the BOQ?
Yes. Create/View Invoice raises the customer invoice directly from the BOQ, with VAT and SSCL applied per line, no need to re-enter details in Sales.
Are standard bills of quantity reusable?
Yes. Define them once in the Item Assembly master and pull them into any job with Select BOQ, saving time on repeat projects and ensuring consistent costing.
Does a material issue update stock immediately?
Yes. When an issue note is approved, stock at that location and batch is reduced and the cost moves to the job. Issue returns reverse it. All movements are visible in the Inventory module in real time.

Explore More AccSoft ERP Modules

Engineering connects with every other module in AccSoft ERP.